Mitch spent so many hours in the garage, after the kids were in bed at night and on Saturdays, to get these things done, measuring, cutting, drilling, sanding, staining, sealing (three coats!). He built all three of them at once.
Thursday, April 8, 2010
Loft Beds
These pictures are woefully overdue, as these beds have been completed since the end of February.
Mitch spent so many hours in the garage, after the kids were in bed at night and on Saturdays, to get these things done, measuring, cutting, drilling, sanding, staining, sealing (three coats!). He built all three of them at once.
The kids love them. Great job, babe.
Mitch spent so many hours in the garage, after the kids were in bed at night and on Saturdays, to get these things done, measuring, cutting, drilling, sanding, staining, sealing (three coats!). He built all three of them at once.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment